Some more pics of Refilwe and their setup:

Donated: 3x3m corner posts, 44 x 3m Y-std's and some long treated poles

Donated: Standard high pressure water pipe, I think over 50m, not sure.

Fish farm / vegetable enclosure. Dams will be somewhere to the left, with the earth worm farm to the far left. Front and right are vegetable beds being constructed and filled with compost.

Beds are filled with grass and cardboard and then topped up with organic compost.
